Underground Utilities · Charlotte & Gaston County
Water, sewer and storm drainage in Charlotte and Gaston County.
John E. Jenkins, Inc. installs water, sanitary sewer and storm drainage for commercial, industrial and institutional sites, most often as part of a site package Jenkins also grades and paves.
Utilities sequenced with the rest of the site
Pipe in the ground decides when the pad, curb and pavement can go in. Because Jenkins usually carries the grading and paving on the same site, trenching, structures, tie-ins, testing and backfill are scheduled with the rest of the work instead of around it.
Jenkins takes full site packages and focused utility scopes. At a car wash on Mount Gallant Road in Rock Hill, SC, for example, the scope was site preparation and underground utilities. Jenkins can include jack-and-bore crossings and lift stations under its contract and coordinate specialty subcontractors as needed.
Common questions
- Does Jenkins install water and sewer for commercial projects in Charlotte? Yes. In Charlotte, Jenkins installed sanitary sewer with bypass pumping and a complete water system with RPZ backflow assemblies, fire risers and hydrants at Skyway Industrial, and water and sewer utilities at Steele Creek Preparatory Academy.
- What utility work has Jenkins done in Gaston County? At Westside Logistics in Gastonia, Jenkins installed 3,025 linear feet of 8-inch water main, about 800 linear feet of sewer main and roughly 2,276 linear feet of RCP storm drainage. At Carolina CAT Gastonia the package included sanitary sewer, domestic and fire water service and storm drainage.
- Does Jenkins do jack-and-bore crossings? Yes. Jenkins can include jack-and-bore crossings under its contract and coordinate specialty subcontractors as needed. Examples include an 80-linear-foot crossing at Westside Logistics and a crossing added mid-project at Skyway Industrial.
- Can Jenkins handle lift stations and sewer bypass pumping? Yes. Jenkins can include lift stations and sewer bypass pumping in its utility scope and coordinate specialty subcontractors for lift station work as needed. At Skyway Industrial, the work included sanitary sewer bypass pumping, manholes, tie-ins and testing, and a lift station added mid-project with minimal schedule impact.
Recent utility work
Water. Westside Logistics included 3,025 linear feet of 8-inch water main with hydrants, meters and backflow assemblies. Skyway Industrial had a complete water package with multiple tap sizes, RPZ backflow assemblies, fire risers and hydrants. Hambright Industrial in Huntersville used ductile-iron water utilities. See Westside Logistics.
Sanitary sewer. Skyway Industrial in Charlotte included sewer bypass pumping, manholes, tie-ins and testing, plus a lift station. At Westside Logistics, crews built 8-inch sewer main with manholes and outside drops. Hambright Industrial included relocated sanitary sewer. See Skyway Industrial.
Storm drainage. Jenkins built RCP storm systems up to 42 inches at Skyway and up to 54 inches at Hambright, both with wet-pond conversions. Westside Logistics had roughly 2,276 linear feet of RCP, 21 storm structures and a sand-filter conversion. At the McGill Family YMCA in Belmont, Jenkins installed 18-, 24- and 30-inch RCP with catch basins and manholes. See Hambright Industrial.
Schools and campuses. Jenkins installed water and sewer at Steele Creek Preparatory Academy in Charlotte, and the McGill Family YMCA package included a sanitary sewer lateral, water tap, RPZ, water service and testing and flushing. See the YMCA project.

Charlotte, NC
Skyway Industrial
Sewer, water + lift station
Gastonia, NC
Westside Logistics
Water, sewer + RCP storm
Huntersville, NC
Hambright Industrial
RCP up to 54 inches
Gastonia, NC
Carolina CAT Gastonia
Sewer + fire water
Charlotte, NC
Steele Creek Preparatory Academy
School water + sewer
Belmont, NC
McGill Family YMCA
Campus storm + servicesHave a utility-heavy site in Charlotte or Gaston County?
Share the civil drawings with the Jenkins estimating team, or call (704) 864-5421.